How to Interpret Our Chart

After finding your state, use the other columns to understand the following:

  • Code Edition: The version of NFPA 70 adopted by the state or applicable jurisdiction. Requirements may differ by construction type or location.
  • Adoption Date: When the listed standards took effect. States establish their own adoption schedules.
  • Notes: Details about amendments, enforcement authority, and pending updates.

NEC Adoption by State

StateCode EditionAdoption DateNotes
Alabama2020July 1, 2022Adopted by the Alabama Division of Construction Management
Alaska2020April 16, 2020
ArizonaVariesN/ANo statewide enforcement. Local regulations apply.
Arkansas2020August 1, 2022Enacted with amendments. 2026 update in progress.
California2023January 1, 2026The 2025 California Electrical Code Title 24, Part 3 includes amended NEC material.
Colorado2026August 1, 2026
Connecticut2020October 1, 2022Enacted with amendments. 2023 update in progress.
Delaware2023January 1, 2026
Florida2020December 31, 20232023 update in progress.
Georgia2023January 1, 2025
Hawaii2020March 14, 2023
Idaho2023July 1, 2023Enacted with amendments, which also allow the use of the 2017 edition in some cases.
IllinoisVariesJuly 1, 2011Local municipalities have adoption authority. The 2008 edition is used for commercial occupancies not under local jurisdiction. The 2018 Chicago Electrical Code is based on the 2017 edition.
Indiana2008/2017August 26, 2009 and December 26, 2019Enacted with amendments. 2008 is for commercial projects and 2017 for one- and two-family dwellings. 2023 update in progress.
Iowa2023July 1, 2025Enacted with amendments. 2026 update in progress.
Kansas2008N/ANo statewide requirement. Local municipalities enforce or modify the 2008 edition.
Kentucky2023January 1, 20252026 update in progress.
Louisiana2020January 1, 2023
Maine2026July 1, 2026Includes amendments.
Maryland2020July 1, 2025Includes local amendments. 2023 update in progress.
Massachusetts2026April 24, 2026Enacted with local amendments.
Michigan2023/2014March 12, 2024 and February 8, 20162023 edition applies to commercial occupancies; 2014 edition applies to one- and two-family dwellings. 2026 update in progress for commercial.
Minnesota2026August 17, 2026
MississippiVariesN/ANo statewide adoption. Incorporated locally by reference only.
MissouriVariesN/ANo statewide adoption. Incorporated locally by reference only.
Montana2020June 10, 2022Includes amendments. 2023 update in progress.
Nebraska2023August 1, 20242026 update in progress.
Nevada2017/VariesJuly 1, 20182017 edition adopted by the Nevada State Public Works Division for public projects. Jurisdictions handle local enforcement.
New Hampshire2023July 1, 2025Includes local amendments.
New Jersey2020September 6, 2022Approved version includes local revisions.
New Mexico2020March 28, 2023
New York2023December 31, 2025The 2025 NYC Electrical Code uses an amended 2020 edition.
North Carolina2020November 1, 2021Includes revisions for occupancies other than one- and two-family dwellings.
North Dakota2026July 1, 2026
Ohio2023March 1, 2024 and April 15, 20242023 edition effective for commercial occupancies; residential occupancies adopted with state amendments.
Oklahoma2023September 14, 2024
Oregon2023October 1, 2023Includes local revisions. 2026 update in progress (projected October 1, 2026).
Pennsylvania2020January 1, 2026
Rhode Island2023December 1, 2025
South Carolina2020January 1, 2023Includes specific revisions. 2023 update process complete; effective January 1, 2027.
South Dakota2023November 12, 2024Revised for local needs.
Tennessee2017October 1, 2018Amended for unique needs.
Texas2023September 1, 2023
Utah2023January 1, 2025
Vermont2020January 1, 20232023 update in progress.
Virginia2020January 18, 20242023 update in progress (effective date not established).
Washington2023April 1, 20242026 update in progress (projected December 31, 2026).
West Virginia2020August 1, 2022Amended for local requirements.
Wisconsin2023September 1, 2026Revised for specific situations.
Wyoming2026July 1, 2026

Last update: September 2026. Confirm applicable requirements and amendments with your state or local authority before beginning electrical work.

State Adoption and Enforcement

Some states adopt the NEC statewide, while others leave adoption and enforcement to local authorities. Arizona and Missouri, for example, have no single statewide adoption requirement, so electricians must follow applicable local regulations.

Requirements can also vary by construction type. Michigan uses the 2023 NEC for commercial occupancies but the 2014 edition for one- and two-family dwellings.

Jurisdictional Changes

States and municipalities can amend nationally published standards to address local construction and safety needs.

For example, California incorporates the 2023 NEC into its 2025 California Electrical Code with state-specific modifications. New York City maintains its own electrical requirements, based on an amended 2020 edition rather than the version adopted statewide.

Before beginning a project, review any amendments issued by the applicable authority having jurisdiction (AHJ), such as your state electrical board or local building department.

What Happens When a State Adopts a New NEC Edition?

Adoption can affect projects already in development as well as the training electricians need to obtain or maintain their licenses. The timing and requirements depend on the jurisdiction.

How Does Adoption Affect Existing Projects?

Projects permitted before an adoption date may be allowed to continue under previous requirements, while new permit applications must follow the updated standards.

For example, when Minnesota adopted the 2026 NEC, the applicable version depended on when an electrical permit was filed. Projects filed before August 17, 2026, remained subject to the previous requirements, while newer permits had to comply with the updated standards.

Local transition procedures may differ. In Aurora, Colorado, existing single-family master plans automatically transitioned to the 2026 NEC for subsequent permits. Multifamily master plans, however, required revisions before additional permits could be issued.

How Does Adoption Affect Training and Licensing?

Newly adopted requirements can change what electricians need to study for licensing exams and continuing education (CE).

For example, Texas adopted the 2023 NEC on September 1, 2023, and updated its electrical licensing exams to reference that version beginning October 1. Applicants taking an exam after the transition needed to prepare using the newer material.

Washington requires electricians to complete eight hours of training on changes to the currently adopted NEC as part of their 24-hour CE requirement. After the 2023 NEC took effect on April 1, 2024, electricians could meet this requirement through approved courses covering those changes. With the 2026 NEC set to take effect on December 31, 2026, electricians renewing afterward should verify which approved update course satisfies their renewal requirements.

Adoption does not automatically invalidate previously completed training or require every electrician to take additional courses immediately. Requirements depend on the license type, renewal period, and state rules.

JADE Learning offers state-approved electrical continuing education and electrical exam preparation courses to help electricians meet licensing requirements and understand applicable standards.

Accessing the NFPA 70 Code

The National Electrical Code is available in print and digital formats directly from the NFPA. You can also access its standards through an NFPA LiNK subscription.

To view available NEC editions for free:

  1. Visit the NFPA 70 page.
  2. Select the edition you want to review.
  3. Click View Free Access.
  4. Sign in to your NFPA account or create one if needed.