Section 250.25 is brand new for the 2020 Code cycle. It has been created to establish grounding and bonding rules for add-on disconnects, such as a PV system disconnect acting as that PV system’s service equipment, when the disconnect is attached to conductors on the supply side (meaning before the main cut-off) of the utility service disconnect.
Section 230.82 provides electricians with a list of equipment/systems that can legally connect to the conductors on the supply side of an electrical system serving a home or business. The new Section 250.25 outlines grounding and bonding rules for a disconnect serving just such an add-on system.
Don't wait for an Electrical Inspector to teach you the 2023 NEC. Save time, money, and pass inspections the first time by completing our online continuing education courses.