Two new terms found in Article 100, and a clarified evaluation-practice established for the 2017 NEC code-cycle
Electrical equipment is generally approved by a testing laboratory before being shipped by a manufacturer. However, sometimes electricians may need to install spe-cialized gear that has not yet been formally certified. When field certification is neces-sary due to a lack of a UL (or other approved laboratory) Listing, electricians are then required to contact a Field Evaluation Body (FEB) to receive an approval label. Fortunately, updates and new terms in the 2017 NFPA 70 National Electrical Code (NEC) help clarify what should be done when items need to be field labeled by a Field Evaluation Body (FEB).
Prior to the 2017 edition of the NEC, 120-volt receptacles equipped with USB charging outlets had not been addressed by the National Electrical Code.
Universal Serial Bus (USB) connections have been around since the 1990s and are widely used to charge portable devices and computer peripherals, as well as transfer data.
Don't wait for an Electrical Inspector to teach you the 2023 NEC. Save time, money, and pass inspections the first time by completing our online continuing education courses.