For our typical AC electrical system, the purpose of the “Main Bonding Jumper” is to connect the equipment grounding conductors (E.G.C.) contained in each branch-circuit and the metal (conductive) service-disconnect enclosure to the Neutral Conductor of the electrical service. The reason for this is: a driven or buried earth ground […]
Don't wait to let the Electrical Inspector teach you the new 2020 NEC. Save time, save money,
and pass inspections the first time with the NEC Challenge.
Learn 156 of the most important 2020 NEC changes by having Code-based Q&A delivered by text or email three times a week.